Sunday, February 22, 2009

Lakehouse Shower Progress

Cut the bottom section of drywall so the shower pan can sit back as designed.
Also cut open floor to repair shower drain plumbing.


Reworked shower drain plumbing using a flexible coupling.




Replaced section of plywood subfloor.
Added concrete board under shower pan.


Reinstalled shower pan and connected drain.



Moved shower head plumbing and secured it.

Reinstalled drywall and taped and mudded.

Cleaned shower head (it had a lot of debris in it, causing low water flow).

Reinstalled shower head. (The flow is MUCH better).







Installed the right wall panel.

Sunday, January 11, 2009

The basement HVAC has been rerun.

This is a view of the basement family room. You can see the vent in the wall.






















This is a pic standing in the basement bedroom looking out into the hall. You can see that the ductwork has been moved over closer to the

Here are a few pics from the Festival of Lights.




Posted by Picasa

Sunday, December 28, 2008

Here are some pics from the big birthday bowling bash.

Natalie, I guess those ruby slippers really helped your scores.






































































Tuesday, December 23, 2008


Welcome to our family's blog page.
This is a test posting to see picture resolution.