Sunday, April 26, 2009

Julia and Alayna Dance on the Deck




Lakehouse Shower and Walkway
















Here are a few pics of what we did this weekend. The shower was after I took a shower and the water dripped off of the open door. I think it still needs a little more caulk, but overall, it's pretty good.
We got more than 1/2 of the walkway done. Note: the current stairs are off center, so the walk is not centered with the stairs. It's centered relative to the porch posts.

A few pics from Alayna's Birthday











Sunday, February 22, 2009

Lakehouse Shower Progress

Cut the bottom section of drywall so the shower pan can sit back as designed.
Also cut open floor to repair shower drain plumbing.


Reworked shower drain plumbing using a flexible coupling.




Replaced section of plywood subfloor.
Added concrete board under shower pan.


Reinstalled shower pan and connected drain.



Moved shower head plumbing and secured it.

Reinstalled drywall and taped and mudded.

Cleaned shower head (it had a lot of debris in it, causing low water flow).

Reinstalled shower head. (The flow is MUCH better).







Installed the right wall panel.

Sunday, January 11, 2009

The basement HVAC has been rerun.

This is a view of the basement family room. You can see the vent in the wall.






















This is a pic standing in the basement bedroom looking out into the hall. You can see that the ductwork has been moved over closer to the

Here are a few pics from the Festival of Lights.