Sunday, April 26, 2009
Lakehouse Shower and Walkway
Here are a few pics of what we did this weekend. The shower was after I took a shower and the water dripped off of the open door. I think it still needs a little more caulk, but overall, it's pretty good.
We got more than 1/2 of the walkway done. Note: the current stairs are off center, so the walk is not centered with the stairs. It's centered relative to the porch posts.
Sunday, February 22, 2009
Lakehouse Shower Progress
Cut the bottom section of drywall so the shower pan can sit back as designed.
Also cut open floor to repair shower drain plumbing.
Also cut open floor to repair shower drain plumbing.
Reworked shower drain plumbing using a flexible coupling.
Replaced section of plywood subfloor.
Added concrete board under shower pan.
Reinstalled shower pan and connected drain.
Moved shower head plumbing and secured it.
Reinstalled drywall and taped and mudded.
Cleaned shower head (it had a lot of debris in it, causing low water flow).
Reinstalled shower head. (The flow is MUCH better).
Installed the right wall panel.
Sunday, January 11, 2009